Time and Work

Formulas on Time and Work

  • If A can do a piece of work in n days, work done by A in 1 day = 1/n

  • If A does 1/n work in a day, A can finish the work in n days

  • If M1 men can do W1 work in D1 days working H1 hours per day and M2 men can do W2 work in D2 days working H2 hours per day (where all men work at the same rate), then M1 D1 H1 / W1 = M2 D2 H2 / W2

  • If A can do a piece of work in p days and B can do the same in q days, A and B together can finish it in pq / (p+q) days

  • If A is thrice as good as B in work, then

    Ratio of work done by A and B = 3 : 1

    Ratio of time taken to finish a work by A and B = 1 : 3

 

Author Profile

IBPS Preparation Team
IBPS Preparation Team
At IBPS Preparation,We provide pathway for any candidate who wishes to shine in the recruitment process of IBPS.

Leave a Reply

Your email address will not be published. Required fields are marked *

7 + 5 =


© Copyright 2017 - All Rights Reserved | DesignzRush (OPC) Pvt. Ltd.
Complete Solution for Banking Exams in India
Inline
Inline